our main projects

const

Petroleum references

  • Electrical and instrument installation for Larich Gas valorization Project of ENI
  • Electrical and instrument installation of Project of Tazarka CPF new laboratory of ENI
  • Installation of CCTV systems on Baraka & Maamoura oil offshore platforms of ENI
  • Installation of two diesel generator packages with its diesel pumps and storage tank on maamoura and Baraka offshore platform of Eni.
  • Revamping of open and close drain systems of Baraka platform of ENI
  • Baraka Oil offshore Platform – Installation of Online Acoustic Sand Monitoring System of ENI
  • Feasibility Study of Tazarka CPF power generation Upgrading of ENI
  • Cost Estimate of Project of Tazarka CPF power generation Upgrading of ENI
  • Revamping of Open Drain System of Tazarka CPF onshore site of ENI
  • Installation of 6kV/400V - 2500KVA triphase power transformer in CPF onshore site of ENI
  • PCV Sales valve project in CPF onshore site: regulation of pressure sales gas in STEG network of ENI
  • Fire Fighting System Upgrading in Tazarka CPF onshore site of ENI
  • Modification of LPG for off spec in Tazarka CPF onshore site of ENI
  • Amine Unit upgrading in Tazarka CPF onshore site (installation of new amine unit) of ENI
  • Installation of new Nitrogen Unit on the CPF onshore site of ENI
  • Installation of a Fire and gas detection system on Hammouda onshore site of ENI
  • Installation of earthing & lightning protection system for Ouedzar onshore site of ENI
  • Installation of a water treatment unit on Ouedzar onshore site Revamping of oil treatment unit of Djebel Grouz onshore site of ENI
  • Engineering and supervision of works of the electrical installation (electrical power 3MVA) of TUNISIE GAZ INDUSTRIES « TGI » factory of de M’GHIRA.
  • Project of construction of a processing plant of gas for the AGIP Oil & Gas company in its oil field of ABOU ATTEFL in LIBYA (the installed electric power is 1,5MVA).
  • Project of realization of an unit of storage of gas of the SNDP Oil & Gas company in BIZERTE (installed electric power is 630 kVA).
engineering-main

Industrial references

  • Engineering conception of the electrical installation (electrical power 3MVA) and instrumentation of the factory of salt extraction of ALKIMIA in TATAOUIN.
  • Engineering conception of the electrical installation (electrical power 6MVA) and instrumentation of section 5 of TIFERT factory of Skhira.
  • Engineering and supervision of works of the electrical installation (electrical power 10MVA) and instrumentation of TIFERT factory of Skhira to achieve specifications.
  • Engineering conception of the electrical installation (electrical power 6MVA) and instrumentation of the factory of natural oil extraction of KARTHAGE GRAIN.
Social media & sharing icons powered by UltimatelySocial